Key Points

A fixed cost means every selection is made and confirmed before you sign, so you know exactly what you're paying for.
Before you sign, final measurements are taken and a soffit or wall is cut open to see what's inside, and anything found, like ductwork, gets priced then.
Appliances and any changes you make after signing sit outside a fixed price. On a very old house, anything no one can see until the walls are open can sit outside it too.

Nobody wants to hear that their remodel costs more than the first number they were given. We don’t want you thinking you’re paying $100,000, only to find out later that it’s $200,000.

You’ll learn:

  • What a fixed-cost contract means with us
  • What’s in the price, and what isn’t
  • Why a quote grows, and when that happens
  • What has to be decided before we give you a price
  • What to ask any remodeler before you sign

How Does a Fixed-Cost Remodeling Contract Work?

With us, a fixed cost means everything is 100% selected and confirmed before you sign a single thing. You know exactly what you’re paying for before you move forward. The contract lists the work line by line, with one price at the bottom. That works because we design the project and make every selection with you first. You can see how that works in our remodeling design process.

We don’t want to do “demo and see,” where the walls get opened first and the price gets worked out after. Instead, we check the house before you sign, and we price projects as a fixed cost whenever we can. On a very old house, though, we sometimes can’t know everything until the walls are opened up.

Finished basement with a black tin ceiling, brick fireplace, bar seating, and a projector screen

Our basement remodel in Alexandria is in a house over 100 years old. We gave the homeowners a minimum price, not a fixed cost, and told them to expect that price to go up a lot once we opened the walls and they made their selections. After demolition, the foundation wall turned out to be cracked, and we had to fix it inside and out. They also chose upgrades, like the brick on the walls, and we were upfront that those would be extra.


What Does a Fixed Price Cover, and What Doesn’t It Cover?

We take care of the design and the build, and we handle permits and inspections in-house as part of the fixed-cost contract. About 90% of the work is done by our own employees, not subcontractors. Because our own crews do the work, a small fix on site doesn’t turn into a change order. If our crew needs a couple of extra hours to get something right, we don’t charge you for it, as long as it’s nothing major.

A few things sit outside the fixed price, such as:

  • Appliances. You choose and buy those.
  • Changes you make after signing. If you decide to change something once the contract is signed, we write it up as a change order, and you sign it before that work starts.

A hall bathroom shows what goes into a price with us. Our small hall bathrooms start at $30,000, and the one in this video came in at $31,000. Most of the bathrooms we get run over $75,000, because they need more work from skilled trades. Here’s what went into that $31,000:

  • Permits, which we pull
  • A plumber, an electrician, and a tile installer, each doing their own trade
  • A designer who worked one-on-one with the homeowner on the selections
  • All-new plumbing in the room
  • A dedicated 20 amp outlet

Why Does a Quote Grow Before You Sign?

If your price is going to change, we want you to know before you sign, which is why we check the house first. Say we cut into a soffit (the boxed-in part along a ceiling) and find ductwork running through it. We’ll tell you how much more that adds, and it goes into the price before you sign.

Your selections work the same way. You make them all before you sign, so if they put you over budget, you know by exactly how much while you can still change them.

Cabinets are a good example, and this video walks through the 3 lines we work with. The line you pick changes what your cabinets cost, which is why we want that choice made before you sign.

  • Forevermark. Our more budget-friendly line, with standard sizes and fewer options. It can be a smart choice if keeping cabinet costs lower is a priority.
  • Waypoint. A semi-custom line, with more choice in sizes, finishes, and door styles.
  • Dura Supreme. The most customizable line, typically used on higher-end projects.

What Has to Be Decided Before We Put a Number on Paper?

Cabinet showroom with display kitchens and an island with bar stools

You make your selections at our Design Center in Lorton, before anything is priced into your contract. It’s one of 4 steps we finish before you sign, and our post on the steps of a design-build remodel has more detail:

  • Discovery call. We go over similar projects and what they cost, and you get a ballpark price.
  • As-built plan. We measure your home exactly as it stands today, so the new design starts from what’s really there.
  • Design and selections. You see the design in 3D renders, and we go over exact prices for exact products at our Design Center.
  • Final check. We come back, take final measurements, and cut a hole in a soffit or wall where we need to confirm what’s inside.

You don’t sign until every step is done, so the price in your contract is based on your actual house.

Some projects need one more answer first. For a bump-out, we can’t give you a firm price until a survey shows what the county will let you build. In Fairfax County, for example, a bump-out needs a permit, and setbacks and other zoning requirements may apply.


What Should You Ask Before You Sign?

Whoever you hire, ask what they check before they give you a price, and what happens to that price if they find something once the walls are open. Their answers tell you whether your price is likely to stay the same.


Ready to Talk Through Your Price With WISA Design Build Remodel?

If you’d like to talk through how your project would be priced, we’re glad to walk you through it before anything is signed. Fill out our contact form or give us a call.

Frequently Asked Questions

Can my price still change after I sign?

Your price can change after you sign if you decide to change something, like a finish or a layout. That change becomes a written change order, and you sign it before the work starts. On a very old house, the price can also go up once we open the walls, and we'll tell you before you sign if that's likely.

Why can 2 remodeling quotes for the same project look so different?

2 quotes can look very different because you're buying more than the work: you're buying the people who show up on your job, the customer service that comes with them, and the warranty behind the work. Some kitchen and bath companies can come in lower on small projects, like a hall bath or a simple pull-and-replace kitchen. A design-build firm will usually cost a bit more, so if the lowest price matters most, it may not be your best fit. If it's value you're after, design-build is the way to go.

Is the estimate from your cost calculator the same as your contract price?

Your contract price comes from your actual house, not from the estimate on our basement cost calculator. The calculator gives you a starting range, and most of our basements come in over $100,000. Your actual price comes after the discovery call, the as-built plan, the design and selections, and the final check.