Key Points

We draw an as-built plan of your basement as it stands today, then design the new layout from it, and some of it isn't confirmed until demo.
The stairs, the HVAC, the electrical panel, and the posts shape where everything goes. Stairs sometimes get rebuilt to meet code or fit the new layout; the HVAC can be moved, and the panel can hide behind an accent wall.
A bedroom needs a window or door that opens directly to the exterior, so where an egress window can go helps decide where the bedroom goes.

Our basement remodeling service is a full design reconfiguration that uses the space available to get the layout you want while staying efficient with the space. This post covers what the stairs, furnace, windows, and plumbing mean for that layout, and what a few of our finished layouts look like.

You’ll learn:

  • What goes into a basement layout plan
  • When basement stairs need to be rebuilt
  • How the furnace, electrical panel, and posts affect your layout
  • What a basement bedroom needs
  • Why the basement bathroom gets planned early
  • What a few of our finished basement layouts look like

What Goes Into a Basement Layout Plan?

Every one of our job sites has a work ticket. The ticket holds the scope of work and the selections, along with the as-built layout and what we plan to do. We create the as-built plan first, and then we design the new layout from it.

Here’s what the demo-day plan for one of our basements included:

  • Rebuilding the stairs
  • Adding a full bathroom on the side
  • Moving the HVAC over
  • Canceling the laundry room and moving it upstairs
  • Turning a window into an egress window
  • Hiding the sump pump and “all that stuff” in the walls

In one Alexandria basement, the design showed what we thought the layout would be, but we didn’t know until everything got demoed. Once it was, we confirmed what had to change.


When Do Basement Stairs Need to Be Rebuilt?

Basement hallway at the bottom of the stairs with a brick wall and white paneling

In our basement remodel in Alexandria, the stairs come down into a hallway with a brick wall along one side, and the next room opens up at the end of it.

Whenever you’re finishing a basement, bringing the steps up to code is worth thinking about. A rebuild is sometimes needed when the existing stairs don’t meet code, or when a layout change requires one. In another basement, we also updated the stairs to give the space a more finished, cohesive look.


How Do the Furnace, Electrical Panel, and Posts Affect Your Layout?

Unfinished basement with a furnace, ductwork, and pipes before the remodel

The unfinished Alexandria basement had a furnace, ductwork, and pipes running through it before we started.

In the demo-day plan listed earlier, the HVAC gets moved over, and the sump pump and “all that stuff” get hidden in the walls. HVAC upgrades in a basement can include extending the ductwork, adding zoning, or installing mini-split systems. We may also need to upgrade the electrical panel when it can’t carry the added load, and in one basement, an accent wall hides the panel.

Posts and beams matter too. Opening up a basement can mean installing beams, removing posts, or modifying other load-bearing parts. Weight from the main floor can land in the basement as well. When walls open up on the main floor, we may have to carry the weight down to the basement with a new post.


What Does a Basement Bedroom Need?

A lot of our work is in Fairfax County, the city of Falls Church, the city of Alexandria, and Arlington County. Fairfax County’s guide to escape openings says sleeping areas need a window or door that opens directly to the exterior, and a basement window opening has to be at least 20 inches wide and 24 inches high. The opening can sit below grade in a window well.

An egress window is a window that works as an emergency way out. In that same demo-day plan, an existing window becomes the egress window. Our post on basement egress window requirements covers the rules in more detail.


Why Plan the Basement Bathroom Early?

Plumbing and drainage are usually the most difficult part of a basement bathroom. We handle that by planning the layout early and verifying that everything will work as planned, so there are no surprises. A standard basement bathroom includes cutting the slab for the plumbing and the rough plumbing.

Our guide to adding a bathroom to a basement covers the rest of what goes in.

In another basement we’re remodeling in Alexandria, we’d made a lot of progress on the framing and ground plumbing, and the layout of the new space was starting to take shape. The new full bathroom has a drop-in tub inside the walk-in shower, and we were waiting on inspections before the next steps. In the demo-day plan listed earlier, the full bathroom goes on the side of the basement.


What Can Finished Basement Layouts Look Like?

Here’s how 2 of our basements handled it.

In one roughly 800-square-foot basement, the homeowner wanted an open space, so the only part walled off is the bathroom with its walk-in shower.

In another basement, you walk from the bottom of the stairs into a drop-off zone off the garage, with built-in cubbies, hooks, and drawers that double as a bench. From there, you reach a large open rec room that can be used for entertaining, a gym, or extra space to hang out, and the new full bathroom is tucked farther in.


Ready to Plan Your Basement Layout With WISA Design Build Remodel?

If you’re deciding where the bedroom, bathroom, and living space should go, tell us what you’re picturing and what’s already in your basement. We start from the as-built layout and design the new one from there. Fill out our contact form or give us a call.

Frequently Asked Questions

How do I start planning my basement layout?

We start with a discovery call and an in-home meeting. Then we create an as-built plan of your basement as it stands today, and the new design comes after it. Before the contract is signed, our team returns to confirm measurements, cut into soffits and walls, and verify conditions. The contract is signed once everything checks out.

How much does it cost to rebuild basement stairs?

Our typical range for rebuilding basement stairs or correcting them to code is $8,000 to $20,000 or more. Stairs sometimes need a rebuild when the existing ones don't meet code, or when a layout change requires it. We look at the stairs as part of the plan for your basement, alongside the rest of the as-built layout.

How long does a basement remodel take?

Our basements take 12 to 16 weeks, and our average basement takes roughly 16 weeks. Some take 6 months or longer. We're remodeling the entire basement, not just painting the walls and changing the floor. When the plan calls for it, that can include rebuilding the stairs, moving the HVAC, and adding a full bathroom.