Skip to main content

150+ Kitchens Built In NoVa.
Yours Could Be Next.

WISA has been remodeling Northern Virginia kitchens since 2011. Our design-build team handles layout, cabinetry, permitting, and construction under one roof. Most of our kitchen renovations represent an investment between $75,000 - $175,000.

Start Panning Your Dream Kitchen Today

Response Within 24 Hours

13+ Years

Serving Virginia homeowners with trusted remodeling since 2011.

150+ Kitchens

150+ kitchens completed across NoVA.

In-House Team

Designers, draftsmen, and carpenters all working under one roof.

One Project Manager

One dedicated point of contact from start through completion.

Kitchen Transformations Across NoVa

Virginia's Trusted Kitchen Remodeling Expert

Most kitchen remodels we complete in the NoVa range from $75K to $175K depending on scope and finishes.

A Fairfax Home, Reimagined

This kitchen stayed in its original location, but nearly everything about how it lived changed. Opening the walls and adding a structural beam created a more connected layout, while the cooking area was reworked to make the kitchen easier to use.

The finishes brought the transformation up another level. Double-stacked cabinetry, quartz surfaces, porcelain tile flooring, a refreshed butler’s kitchen, and layered lighting gave the space a more refined, finished feel from every angle.

Before kitchen remodel After kitchen remodel
Before
After

Before

After

Why NoVa Homeowners Trust WISA With Their Renovations

⭐⭐⭐⭐⭐ 5.0 Rating | 120+ Google Reviews

A Better Process
Creates Better Results

Most homeowners remodel a kitchen once, maybe twice, in their lifetime. The process should feel clear and organized from the beginning.

Step 01

Discovery Call & Inspiration Review

We start by learning what is no longer working in your kitchen, how your family uses the space, and what styles feel most like home. Inspiration photos help us understand your goals before discussing scope, budget, and next steps.

Step 02

In-Home Consultation

During the in-home consultation, our team walks through your existing kitchen, studies the layout, and listens to what you want the space to become. We look at flow, storage, natural light, surrounding rooms, and possible design opportunities.

Step 03

As-Built Creation

We document the kitchen as it exists today, including measurements, walls, windows, doors, plumbing, electrical, and surrounding conditions. This gives the design team an accurate foundation before exploring layout changes, cabinetry plans, and renovation possibilities.

Step 04

Design Center Visit

At the design center, you begin seeing the kitchen take shape through materials, finishes, cabinet styles, countertops, fixtures, and other selections. This step helps connect the overall design direction to the details you will use every day.

Step 05

Updated Design

After selections and feedback are reviewed, the kitchen design is refined to better reflect your goals, budget, and home. Layout details, storage solutions, finish choices, and project scope are adjusted so the plan feels clear and ready.

Step 06

Final Measurements & Contract

Before moving into production, we confirm final measurements, review the full kitchen remodeling scope, and walk through the contract details together. This gives everyone a clear understanding of the design, investment, timeline, and expectations before work begins.

Big Decisions Feel Easier
When You Have The Right Answers

What does a kitchen remodel cost in Northern Virginia?

Most of our kitchen renovations fall between $75,000 and $175,000 depending on scope, cabinetry, appliances, and whether the layout changes. Projects involving structural work or an addition run higher. We will give you a specific range for your home during the first conversation, before you have committed to anything.

Design typically runs 6 to 8 weeks, and construction typically runs 10 to 12 weeks. Permitting, custom cabinetry lead times, and project complexity all affect the schedule. You will have a written timeline before construction begins.

In most cases, yes. Living without a working kitchen is an adjustment, but most of our clients stay in their homes. During planning we discuss temporary kitchen setups and how to limit disruption.

Yes. Most kitchen renovations involving electrical, plumbing, mechanical, or structural work require permits. We handle those requirements and coordinate with jurisdictions across the NoVA.

We work on a fixed-cost basis, so you’ll see actual costs before your project begins. If something needs to change, whether you request it or demolition uncovers a condition we could not see, we price it and you approve and sign off before any work proceeds. Nothing gets built and billed without your written approval first.

We do not offer financing directly. We can refer you to financing partners we have worked with before if that is helpful as you plan.

Design-build brings design, planning, selections, and construction under one team. Instead of coordinating multiple companies, you have a single point of accountability from the first conversation through the final walkthrough.

Let’s Start Designing Your Dream Kitchen

Your kitchen should be more than just functional. It should be a space designed for gathering, cooking, and everyday living. Our design-build team works with homeowners across NoVa to create kitchens that are both beautiful and thoughtfully planned.

Schedule a consultation to start exploring what’s possible for your home.

⭐⭐⭐⭐⭐ 5.0 Rating | 120+ Google Reviews

Northern Virginia's Premier Design-Build Remodeler Since 2011