Key Points

Checking inside the walls and having every selection made before signing keeps a budget from climbing, and decisions made on time keep a schedule from slipping.
WISA posts updates in the client portal 3 to 5 times a week, and its own employees do about 90% of the work.
Whether you can live at home during the work depends mostly on the room: a basement is easy, a kitchen is hard, and a full-home project may mean moving out.

When people call us about a remodel, many already have a worry in mind. Maybe they’ve heard about a kitchen that dragged on, or a price that kept climbing. Here are 5 we plan for on every job, and who is in charge of each one. We work across Fairfax County, Arlington, and Alexandria. Our Inside Your Remodel page walks through how we handle each of these 5.

You’ll learn:

  • The 5 things that go wrong on remodels
  • What we do about each one
  • Which parts are up to you
  • What to ask any remodeler before you hire them

What Are the 5 Problems Homeowners Worry About Most?

The 5 are:

  • The budget climbs after you’ve signed.
  • The schedule slips.
  • Nobody tells you what’s going on.
  • The quality of the work isn’t what you expected.
  • Living in the house during the work is hard.

How Do You Keep a Remodel From Going Over Budget?

A budget climbs when the price is set before anyone checks behind the walls, or before you’ve picked your finishes. Before you sign, we come back for final measurements and cut into a soffit (the boxed-in area above the cabinets) or a wall if we need to see inside.

Selection samples with cabinet pulls, hexagon tile, a black cabinet door, and marble-look tile

Your part is the selections: the cabinet door, the countertop, the tile, and the pulls. We price projects as a fixed cost whenever we can. For us, a fixed cost means every selection is made and confirmed before you sign, so you know exactly what you’re paying for. Because our own crews do most of the work, a small change on site usually doesn’t turn into a change order.


How Do You Keep a Remodel From Running Late?

One delay we plan for is a decision that can’t be made until the walls are open. Your part is making those decisions when they come up, because the job waits on them.

Finished basement with a brick fireplace, bar seating, and a black tin ceiling

Our basement remodel in Alexandria was in a house over 100 years old, and a lot about the job couldn’t be figured out until we opened things up. The job paused for 6 weeks while the last finishes were picked and some structural questions were worked out. We were wrapping some of the walls in brick veneer, and once you cut a hole in brick you can’t undo it, so we had to know exactly where every outlet and light was going before we ran the wires. We knew from the start that the job would need that pause.

On our side, one person from our own family runs the schedule for our crew of about 25 to 30 installers, and he’s on our job sites almost every day. Clients like that they can see him there. Outside a planned pause like that one, we don’t want dead days where nobody is working in your house.


How Will You Hear From Us During the Remodel?

We try to over-communicate. You get access to your project portal, where we post an update on your job 3 to 5 times a week. We check in with you at each big step of the job, and every 2 to 3 weeks we reach out to see if anything is bothering you, because we’d rather hear about a problem early than after it grows.

You also get a project developer who runs your job and answers your questions, and we respond quickly by text and email. If you’re busy or travel a lot, we can meet over Zoom and bring finishes to your home. If something doesn’t feel right, tell us early.


How Do In-House Crews Protect the Quality of the Work?

This one is on us. About 90% of the work on your project is done by our own employees, not subcontractors. The main things we hire out are countertops and shower glass. Every project comes with a 1-year labor warranty.

Our crews’ work also gets checked from outside the company, because we pull permits even on a hall bathroom. Fairfax County, for one, requires permits for kitchen renovations, bathroom remodels, and finished basements. On one of our kitchens, we passed the framing inspection and the rough-in inspection. The rough-in inspection happens before the walls are closed up.


How Do We Keep Your Home Livable During the Work?

Many of our homeowners live in the house while we work, and how that feels depends on the room. A basement is easy to live with, because we’re away from where you spend your day. A kitchen is hard, because in our area a kitchen job often means removing walls on the main floor. On a full-home project, you may not be able to live in the house during the work, so we can talk about doing it in phases instead.

On this main-floor job in West Springfield, the dining room wall is gone and the kitchen is being rebuilt as an L shape.

We keep the mess down:

  • Zip walls around the work area
  • Drop cloths that get changed out every day
  • Whole-home vacuuming and duct cleaning on larger projects
  • A cleaning company we hire, even on a hall bath, to deep clean the space we worked in and vacuum the rest of your home

Ask us early whether you can stay in the house during your project, and we’ll plan around it together.


What Should You Ask Before You Hire Anyone?

Some of these 5 are on us, and some are on you. Whoever you hire, ask them how they handle all 5:

  • How do you price the job, and what do you check before I sign?
  • Who runs the schedule, and what happens while a decision is waiting?
  • How often will I hear from you, and how?
  • Who does the work, your own crew or subcontractors?
  • Can I live in the house while you work?

If you stop by our Design Center in Lorton, we’ll answer them for your own project.


Ready to Talk Through Your Remodel With WISA Design Build Remodel?

Ask us the hard questions before you sign. Fill out our contact form or give us a call, and we’ll talk through your project and which of these 5 apply to it.

Frequently Asked Questions

Can we live in our home during the remodel?

You can usually live in your home during a remodel, but it depends on the project. A basement is easy to live around. A kitchen or main-floor project is much harder on daily life, and on a full-home project you may need to be out, or we can talk about doing the work in phases.

What happens if something unexpected turns up behind a wall?

We cut into soffits and walls and take final measurements before the contract, so if we find something, we change the price before you sign. If something small comes up during the work, our own crew usually just takes care of it. If something bigger turns up after you sign, we write it up as a change order, and you sign it before that work starts.

How often will I actually hear from someone?

Your portal gets updates on your job 3 to 5 times a week, and we check in every 2 to 3 weeks whether or not anything is wrong.

Read More From WISA Design Build Remodel